You want old question paper of Assistant Executive Engineer exam conduct by Andhar Pradesh Public Service Commission so I have its question paper in pdf file and I am uploading this for you. There are total number of questions in question paper are 150. I am attaching question paper right down here and you are free to download it.
Attached Files Available for Download
File Type: pdf APPSC Assistant Executive Engineer Question Paper.pdf (97.9 KB, 1324 views)
__________________
Answered By StudyChaCha Member
Reply With Quote
  #3  
Old January 26th, 2014, 01:22 PM
Junior Member
 
Join Date: Jan 2014
Post appsc aee previous all question papers

i prepare for appsc aee exam..im a civil engineer..i searching all previous aee question papers
Reply With Quote
  #4  
Old February 20th, 2014, 10:15 AM
Super Moderator
 
Join Date: Jun 2013
Default Re: APPSC Previous Papers Assistant Executive Engineer

As you are looking for the APPSC Previous Papers Assistant Executive Engineer,

1. In a transistor when base-width decreases with increasing collector to base voltage, this phenomenon is called

A) Early Effect
B) Thermal Runaway
C) Tunnelling
D) Pinch-off

2. An amplifier has a voltage gain of 100. To reduce distortion, 10% negative feedback is employed. The gain of the amplifier with feedback is

A) 1.01
B) 9.09
C) 90.9
D) 101

3. The internal impedence of an ideal current source is

A) Zero
B) Low
C) High
D) Infinity

4. The condition for reciprocity of a two port network is

A) AD - BC = 1
B) AD - BC = 0
C) A = D
D) B = C

5. The polar radiation pattern of a loop aerial is

A) Circle
B) Ellipse
C) Cardiod
D) Figure of Eight (8)

6. For the purpose of comparison, the steam generating capacity of a boiler is generally expressed in terms of

A) Equivalent evaporation
B) Kg/hr
C) Steam pressure
D) Thermal efficiency

7. One of the following methods is adopted for governing of steam turbines in a power plant

A) Hit and miss governing
B) Blow off in boiler
C) Throttle governing
D) Speed control

8. An aircraft gas turbine operates on

A) Sterling cycle
B) Bryton cycle
C) Rankine cycle
D) Otto cycle

9. The output of a gas turbine is 300 KW and its efficiency is 20 percent, the heat supplied is

A) 150 KW
B) 6000 KW
C) 600 KW
D) 15 KW

10. Which of the following is not used as a refrigerant?

A) Carbon monoxide
B) Amonia
C) Sulphur dioxide
D) Carbon dioxide







__________________
Answered By StudyChaCha Member
Reply With Quote
  #5  
Old September 22nd, 2014, 01:35 PM
madhugopal
Guest
 
Thumbs up Re: APPSC Previous Papers Assistant Executive Engineer

please send aee all previous papers
Reply With Quote
  #6  
Old January 24th, 2019, 03:15 PM
Unregistered
Guest
 
Default adhar num problem in otpr

sir msir my name is badugu ashok s/o badugugu babu rao
i have a problem in one time profile registration, that is when i am enter the andhar num in otp profile on that time that is shows my number is already exist but fact is i am not register my adhar num on it. i am frankly telling to you sir before one week i want register my otp at that time i was just enter my adhar num only at that power is gone due to that i am not able to register otp plese sir once you check and remove my adhar num on it i will register freshly sir my adhar number is 4015 1173 5246


please solve my problem very fastly sir

thanking you sir,

yours faith fully,
B.Ashok
Reply With Quote
Reply


Tags
tax assistant



All times are GMT +6. The time now is 01:57 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2 3 4 5 6 7 8