Go Back   StudyChaCha 2024 2025 > StudyChaCha Discussion Forum > General Topics

  #1  
Old October 23rd, 2017, 03:10 PM
Unregistered
Guest
 
Default NTPC Nabinagar Contact No

Can you provide me the contact address and contact number of NTPC Ltd. as I want to know if there is any opening available in its Nabinagar Super Thermal Power Project (NSTP)?
Reply With Quote
Other Discussions related to this topic
Thread
Contact Phone Number of Koldam Hydro Power Project NTPC Bilaspur
NTPC FGD Tender
NTPC Hyderabad Contact Details
Www.NTPC.Co.In Jobs
NTPC MT Pay Scale
NTPC MD Name
BCOMIT NTPC
MDI NTPC
NTPC CSR Activities
NTPC Model
NTPC RRB BBSR
Yugantar NTPC
NTPC hydro ltd. (nhl)
Contact Details of NTPC
MBA NTPC
NTPC PSU
Eligibility for NTPC
want job in NTPC?
NTPC ET Result
Result of NTPC ET






  #2  
Old October 23rd, 2017, 03:50 PM
Super Moderator
 
Join Date: May 2011
Default Re: NTPC Nabinagar Contact No

The Nabinagar Super Thermal Power Project (NSTP) of Bhartiya Rail Bijlee Company Limited (BRBCL) is a joint venture of NTPC Limited and Indian Railways to install a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India.

The project site is situated on a State highway which is 25 km south of NH-2 from Barun, 9 km from ‘Nabinagar Road’ Railway Station and 100 km from Gaya Airport.

The contact address and contact number of NTPC Ltd. as I want to know if there is any opening available in its Nabinagar Super Thermal Power Project (NSTP) is as follows:

Contact Detail:
NTPC Limited
NTPC Bhawan,
SCOPE Complex, Institutional Area, Lodhi Road,
New Delhi - 110003
EPABX Board NOS.:
+91 11 24360100, 24387000, 24387001
Fax NO.: 91 11 24361018
Email: info@ntpc.co.in

Nabinagar Thermal Power Project Details


Inputs
Water requirement for the project is 60 cusec which is allocated from the upper stream of the Sone River (Indrapuri Barrage).
Coal requirement for the project is 5 MTPA.
The coal linkage of 5 MTPA has been accorded from Pachra & Pachra south block, North Karanpura Coalfield of Central Coalfields Limited (CCL) which is approx. 215km from the project site.

Beneficiaries
The beneficiaries for the power generated from NTPP are: Indian Railways - 90 % and Bihar State - 10 %. PPA has been signed with both of the beneficiaries.

Installed Capacity
Unit Capacity (In MW) Date of Commissioning Status
1 250 2016 March Commissioned
2 250 2017 April Commissioned
3 250 Under Erection
4 250 Under Erection
__________________
Answered By StudyChaCha Member
Reply With Quote
Reply


Tags
Indian Railways



All times are GMT +6. The time now is 05:57 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2 3 4 5 6 7 8