#1
| |||
| |||
![]()
From where can I free download CPWD Delhi Schedule of Rate? Give me website name? The detail of CPWD Works Manual Schedule of Rates 2014 is as follows: (1) (a) To facilitate the preparation of estimates, as also to serve as a guide in settling rates in connection with contract agreements, a schedule of rates for each kind of work commonly executed should be maintained up-to-date in the Department. It should be prepared on the basis of the rates prevailing in each station and necessary analysis of the rates for each description of work and for the varying conditions thereof should, so far as practicable, be recorded. (b) In order to keep up-to-date schedules referred in (1a), the (a) nomenclature with specifications and (b) market rate list and (c) analysis of rate shall be forwarded to the authority responsible for issuing the Schedule of Rate for all items (Sanctioned Extra/ Substituted Item or item in Technically Sanctioned estimate) which either cost more than 5 Lac rupees or are repeated more than once in a division, circle, project or zone. The responsibility shall rest with the EE(P) framing the estimate or EE disbursing payment against the EI/SI.(Modified vide OM DG/MAN/255 dt. 07.12.2012). (2) The Schedule of Rates for Delhi shall be issued under the authority of DG,CPWD and Kolkata, Chennai and Mumbai by the Special Director Generals for their respective Regions/Zones. These shall be revised at least once in two years. (Modified vide OM DG/MAN/255 dt. 07.12.2012). (3) The rates entered in the estimates should generally agree with the scheduled rates, but where due to any reason, the later are not available, market rates may be considered. (4) Wherever the work of Flyovers, Bridges, Grade Separators and Highways/Hill Roads/ Major Roads are involved, MORTH specifications and its standard data book for the analysis of rates shall be followed. In analysis of rates, the prevailing market rates at the location of work shall be adopted. (Added vide OM No. DG/MAN/264 dt. 20.2.2013) CPWD Schedule Of Rates ![]() ![]() ![]() ![]() more detail to atteched a pdf file.............................. Last edited by Aakashd; December 6th, 2019 at 12:22 PM. |
#2
| |||
| |||
![]()
As you want to free download CPWD Delhi Schedule of Rate so I have its detail and I am sharing it with you: 1.7.1 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire Metre 173.00 1.7.2 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire Metre 198.00 1.7.3 2 X 4 sq. mm + 1 X 4 sq. mm earth wire Metre 228.00 1.7.4 2 X 6 sq. mm + 1 X 6 sq. mm earth wire Metre 298.00 1.7.5 2 X 10 sq. mm + 1 X 10 sq. mm earth wire Metre 398.00 1.7.6 2 X 16 sq. mm + 1 X 16 sq. mm earth wire Metre 553.00 1.7.7 4 X 2.5 sq. mm + 2 X 2.5 sq. mm earth wire Metre 296.00 1.7.8 4 X 4 sq. mm + 2 X 4 sq. mm earth wire Metre 357.00 1.7.9 4 X 6 sq. mm + 2 X 6 sq. mm earth wire Metre 483.00 1.7.10 4 X 10 sq. mm + 2 X 10 sq. mm earth wire Metre 774.00 1.7.11 4 X 16 sq. mm + 2 X 16 sq. mm earth wire Metre 1,086.00 For more information you are free to download it.
__________________ Answered By StudyChaCha Member |