Default Accidents in IOCL

Hi I am interested in having the information about the fire accident which took place at the IOCL terminal, at Sitapura industrial area in Jaipur?
Reply With Quote
Other Discussions related to this topic
Thread
Placement In IOCL
IOCL HQ
IOCL Brochure
IOCL Openings
Turnover Of IOCL In-13
IOCL ATF Price
IOCL CTC
IOCL India
ESS IOCL
Scholarship Given By IOCL
IOCL HR
IOCL ECE
IOCL DBC
MSQ IOCL
Director HR IOCL
IOCL PTA Plant
Scholarship By IOCL
Criteria For Job In IOCL
IOCL Home
IOCL RVI






  #2  
Old January 21st, 2017, 01:25 PM
Super Moderator
 
Join Date: May 2011
Default Re: Accidents in IOCL

At night of 29 October, 2009 a fire broke out at IOCL terminal, at Sitapura industrial area in Jaipur. Around 50,000 kl of fuel had been squandered in this mischance. It was a tremendous catastrophe as far as life and property, around 12 individuals were executed and more than 150 were harmed.

The Brief Detail of the Incident:

At night shift of October 29, 2009, the Indian Oil Corporation's POL (Petroleum Oil Lubricants) Terminal at Sanganer in Jaipur was planning to exchange Kerosine (SKO) and Motor Spirit (MS) to the neighboring BPCL Terminal, a normal operation for these Establishments. A group of four (one move officer and three administrators) were keeping an eye on the IOC Installation. Kerosine was "arranged" (pipeline made through) first and from there on the working group continued to plan the MS (tank 401-A) for pumping to BPCL establishment

During the time spent arranging the MS tank, at around 6.10 PM, an enormous break of the item occurred as a fly of fluid from the "Sledge Blind Valve" on the conveyance line of the tank prompting to the MS pump This fluid MS which quickly created vapors, soon overpowered what's more, debilitated the administrator doing the "line up" operation. The move officer, who was close-by, attempted to help the administrator, yet he excessively was influenced by the vapors and fluid, and must be expelled to healing facility in a semi-cognizant state. The 2nd administrator, who was by chance in the bottle at the time, likewise raced to the spot, yet he was too totally overwhelmed by the solid MS vapors and fluid and couldn't be protected. The 3rd administrator on the move, who was expected to be nearby, had prior left for home on some individual work and was accordingly not accessible to start any save or alleviating steps.

After around a hour and 15 minutes of the break having begun, there was an a monstrous blast took after by a gigantic fireball covering the whole establishment. It is evaluated that in this one hour and 15 or 20 minutes of uncontrolled hole, around 1000 tons of MS could have gotten away out, which would have created enough vapor to bring about an blast with the proportionality of 20 tons of TNT.

The wellspring of start, which set off the blast and fire could have been from one of the non fire verification electrical gear in the Regulatory Block, or from a vehicle being begun in the establishment.

The fire which took after the blast soon spread to every single other tank what's more, kept on seething for around 11 days. The administration of IOCL had taken a considered choice to permit the petroleum items to wear out to keep away from further potential outcomes of mishap in the establishment in the enthusiasm of public safety.
__________________
Answered By StudyChaCha Member
Reply With Quote
Reply




All times are GMT +6. The time now is 12:21 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2 3 4 5 6 7 8