Can you provide me the Sample Question Paper for Production Management?

Conversion of food grains, viz., Wheat in to Flour, on a large scale, can be
treated as Production function

A True
B False

In a small scale manufacturing setup, essential functions are

A Purchase
B Maintenance
C Production
D Quality
E All of the above

The process of converting material to products with the help of Purchase, Maintenance, Quality & Production function is

A Manufacturing sector
B IT sector
C Service sector
D None of the above

Input material as Steel, Plastic and rubber material or parts made out of these are used primarily in

A Pharmaceutical industry
B Chemical Industry
C Automobile Industry
D None of the above

Failure of most of the Indian manu facturing companies to face the competition after economic liberalization was because of poor production management

A True
B False

Primarily, Production Management has been necessitated in India, as a focus area
of Management in India in.
A Early 1900
B Immediately after independence
C Post liberalization
D None of the above

In the industry, after 1930 Elton Mayo brought the following as
important aspect

A Time & Motion study
B Worker motivation
C Business Process Re-Engineering
D Inventory Management

In finalizing the plant location when multi location options
with varying benefits are existing, then best way to decide will be using,
A Linear programming
B Without scientific analysis
C Proximity to corporate office
D None of the above

Availability of Power, Fuel, Water influence the selection of plant
Location
A True
B False

For a chemical company, deciding to put up a new plant would
consider one of the following as major deciding factor for location
A Cost of machinery and equipment
B Availability of skilled labour
C Land availability & cost
D All of the above


Most of the suppliers supplying to companies viz., Maruti Udyog,
Hyundai India, Hero Honda have their plants near by to the customers
Because
A Easy availability of labour
B Lower cost of production
C Low cost of labour
D Proximity to customers

Hen a particular product is to be produced in large quantities with
minimum changes, then following type of layout is adopted
A Process Layout
B Product Layout
C Both of the above
D None of the above

Tools required in preparing plant layout
A Flow Process Chart
B Flow diagram
C Template Layout
D All of the above

For ship building, which type of following layout will be appropriate
A Product layout
B Process layout
C Fixed position layout
D None of the above

Turing, Drilling, Reaming, Boring, Cylindrical grinding are the
Manufacturing Processes which generate
A Cylindrical surface
B Flat surface
C Form generating process
D All of the above

Facing, Milling, Shaping an Planning are the Manufacturing processes
followed to generate
A Cylindrical surface
B Flat surface generating Process
C Form generating process
D Surface Treatment

Electro-Discharge Machining manufacturing process is the example of
A Heat treatment
B Joining
C Machining
D All of the above

Hardening, Tempering, Annealing, Normalizing are the manufacturing
processes of
A Heat treatment
B Joining
C Machining
D All of the above

Non-mechanical joining processes employed in manufacturing are
A Welding
B Brazing
C Soldering
D All of the above

In the industry process of obtaining desired shape of metallic parts
using powder of that metal is the process of
A Rolling
B Spinning
C Powder Metallurgy
D None of the above

When more than two or more parts are joined together to form an
integrated item and which can be easily identified. Then it is know as
A Casting
B Forging
C Heat Treatment
D Fabrication

In Manufacturing Processes, machining processes generate Chips
A True
B False

To be competitive for an Engineering organization it has to look into its
internal processes to have higher
A Production volume
B Employee productivity
C Cost of the product
D None of the above

If Air Deccan airlines is to measure the productivity, then one of the
parameters which can be suited will be
A Fleet of aircrafts
B Distance covered by flight
C Number of flights per aircraft / day
D None of the above

If banks are to improve the efficiency, appropriate method of enhancing
the output per employee is to
A Convert manual operating branches to computerized
B Increase more manual operated branches
C Reduce number of branches
D None of the above

Workmen, Work method, Management practices, procedures, etc.,
affecting the productivity of any organization are the examples of
A Internal factors
B External factors
C Both of the above
D None of the above

Simplest way of increasing the productivity of any organization is to
Reduce
A Non Value Adding activities
B Workforce
C Production
D None of the above

For transport company, a measure of productivity can be
A Total number of trucks available
B Total weight or volume transported
C Weight or volume transported per Ton capacity available
D Cannot be measured

In an manufacturing organization, if output in numbers, for a given
number of hours is calculated then it is
A Production
B Productivity
C Delivery
D None of the above

In industry, Productivity means
A Elimination of waste in all forms
B Higher and higher production
C Hard working
D Retrenchment

If a person is inspecting the Engine of Maruti 800 while it is moving on
conveyor, then it will be represented in Flow process chart as
A Arrow & Square
B Circle & Arrow
C Circle & Square
D Only Arrow

When material is waiting near machine for it to be free for processing,
then as part of flow process chart, it is considered as
A Transportation
B Delay
C Operation
D Storage

Storage" in Flow Process Chart is represented by
A Square
B Circle
C Arrow
D Inverted Triangle

When a production system in a manufacturing setup is having process
type of layout with general purpose machines and frequent set up
changes then its
A For Job Order Production
B Continuous flow
C Both of the above D None
of the above

Loading function of Production Planning & Control major activity is
deciding on physical usage of various jobs on different machines
A True
B False

Production Planning & Control in industry involves
A Routing
B Quality
C Both of the above
D None of the above

Systematic approach in planning, procurement, storage and material
handling so as to maximize company 's investment in materials is
A Integrated Materials Management
B Investment planning
C Financial control
D All of the above

In Material planning function of Integrated Materials management if level of
inventory for a part is decided based on criticality of its non
availability, then it is
A A-B-C analysis
B V V----EEEE----D analysis
C Both of the above
D None of the above

Department of Purchase function in Integrated Materials management
should be aware of the following, as operating role
A Current price trend analysis
B Current trends in product material
C Current trends in technology of material
D All of the above

While placing order Purchase department looks only at lowest bidder in
terms of price
A True
B False

Receiving material, Issuing the material upon request and accounting
the material is responsibility of following department in Materials
Management
A Stores
B Material Planning
C Source Development
D All of the above

Keeping machines in running condition, preserving the value of assets
In the industry are the objectives of
A Plant Maintenance
B Production process
C Financial control
D All of the above

As part of maintenance, when a machine is stripped and various parts
are cleaned, oiled, etc., without breakdown Then it is known
A Inspect
B Repair
C Overhaul
D All of the above

As part of maintenance, when an equipment cannot be brought back to
desired level of performance and hence is replaced by new one. Then
it is known
A Inspect
B Salvage
C Overhaul
D All of the above

In American style of Plant Maintenance, responsibility of maintenance
is generally by participation of all, operators in particular
A True
B False

Absence of some features in any product or service resulting in
customer dissatisfaction is
A Quality features
B Delighters
C Both of the above
D None of the above

Determining standards of performance of various parameters, viz.,
Cost, Quality, Safety, etc. is
A Setting Standard
B Appraising Conformance
C Planning for Improvement
D None of the above

As a part of Quality is
A Inspection of product
B Designed and built into product
C Exhorted into product
D None of the above

Confidence level of process based on control charts can give
A Fair prediction of future process outcome
B No prediction of future process outcome
C Exactly same results of current status
D None of the above

A process is desirable if points plot in control charts are
A Randomly between both the control limits
B Only above mean C Only
below mean
D All of the above

For more question I am attaching PDF File with this question.
Attached Files Available for Download
File Type: pdf Production Management Sample Paper.pdf (88.7 KB, 39 views)

Last edited by Aakashd; June 26th, 2019 at 01:14 PM.
Reply With Quote
Other Discussions related to this topic
Thread
RRB Question Paper Sample
TET Sample Question Paper Download
Sample question paper for JEE Main Paper 2
Sample Question Paper of CMJ University
Sample Question Paper of PRT exam
Sample Paper Of Tiss On Hospital Management
CDS Question Paper Sample
MAT Sample Question Paper
Sample Question Paper For Orissa JEE
Sample question paper for Management Trainee Exam
GRE Sample Question Paper
TCS Sample Question Paper
Production and Operations Management DBM Exam paper.
FCI Management Trainee Exam Sample paper
XAT Sample Question Paper
KCET Sample Question Paper
NID Sample Entrance Question Paper
MHT CET Sample Question Paper
NID Sample Question Paper
SSC LDC Sample Question Paper






  #2  
Old September 3rd, 2013, 05:04 PM
Super Moderator
 
Join Date: Dec 2011
Default Re: Sample Question Paper for Production Management

You want to know the Sample Question Paper for Production Management so here I am giving you the Sample Question Paper & syllabus for Production Management

This syllabus is as follows:

UNIT-I
Meaning, nature, scope and major decision areas of production
management; production system: meaning and types (production to
order & production to stock); facilities location; facilities layout and materials handling; line balancing.

UNIT-II
Product and process planning and selection; capacity planning;
aggregate planning and master production scheduling; materials
requirement planning.

UNIT-III
Planning & control in mass production; shop floor and batch
production; line of balance; work study; objectives, pre-requisites and procedure, method study&work measurement.

UNIT-IV
Materials Management- meaning, importance and functions;
purchasing management; stores management and Inventory
management; quality assurance-acceptance sampling, statistical
quality control; maintenance management

For complete syllabus & question paper are providing you the attachment PDF file. You can download free from here.
Attached Files Available for Download
File Type: pdf Sample Question Paper for Production Management.pdf (1.11 MB, 162 views)
__________________
https://t.me/pump_upp
Reply With Quote
Reply


Tags
Question Paper, Sample Paper



All times are GMT +6. The time now is 07:25 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2 3 4 5 6 7 8