#1
| |||
| |||
![]()
Hi I would like to know about APTRANSCO and the details of Schedule of Rates for Labour Items of 220KV and 132 KV Transmission Lines and Substation Works
|
#2
| |||
| |||
![]()
The Transmission Corporation of Andhra Pradesh (APTRANSCO) is the electric power transmission organization of Andhra Pradesh state in India. History The administration of Andhra Pradesh established the AP Electricity Reforms Act in 1998. Accordingly, in mid 1999 the current organization, APSEB, was unbundled into Andhra Pradesh Power Generation Corporation Limited (APGENCO) and Transmission Corporation of Andhra Pradesh Limited (APTRANSCO). APTRANSCO was further unbundled into a "Transmission Corporation" and four "Conveyance Companies" (DISCOMS). Current Role From February 1999 to June 2005 APTRANSCO was the single purchaser of electrical power in the state, obtaining power from generators and pitching it to DISCOMs as per the terms and states of the individual power buy understandings (PPAs) at mass supply tax rates. Along these lines, as per the Third Transfer Scheme informed by GoAP, APTRANSCO has stopped power exchanging yet has held control of energy transmission framework operations Performance APTRANSCO and DISCOMs possessed and worked transmission lines from 400 kV to 11 kV are 231,127 circuit kilometers barring the HT lines claimed and worked by Power Grid Corporation of India in the state. The spread of high voltage transmission lines (≥ 11 kV) is with the end goal that it can shape a square framework of range 1.93 km2 (i.e. overall, no less than one HT line inside 0.7 km region) in 160,205 km add up to territory of the state. DISCOMs possessed and worked LT lines (beneath 11 kV) are 292,158 circuit kilometers. Subsequently, there are no less than one HT or LT line accessibility by and large inside the region of 306 meters in the whole state. In any case, to 31 July 2015, the most extreme pinnacle stack met was just 6847 MW, and the yearly vitality provided was 48,323 million kWh amid the year 2014-15. The colossal introduced limit of the transmission arrange and the substations is being underutilized with a low request factor. Please find the file attached below which has the details of the Schedule of rates for the labour items of 220KV and 132 KV transmission lines and substation works for APTRANSCO. APTRANSCO - Schedule of Rates for Labour Items of 220KV and 132 KV Transmission Lines and Substation Works ![]() ![]() ![]() ![]()
__________________ Answered By StudyChaCha Member |