#1
| |||
| |||
![]()
Hi I am interested in having the information about the protest by the employees of NTPC against the Performance related Pay structure?
|
#2
| |||
| |||
![]()
A segment of workers at NTPC is challenging the execution connected installment component set up by the general population division control maker from the current money related year. The oppressed representatives have a place with E1 (section position) till E7 (Deputy General Manager) levels. "About 11,000 representatives are dissenting over all power stations of NTPC," Chairman of NTPC Executives' Federation of India. As per the administrator’s alliance, the organization is arranging the last 10 per cent of officials as non-performing and has precluded installment from securing execution connected motivating forces to them. In spite of the fact that the dissenting workers are not totally against this system, they feel that there is no equity in absolutely denying any installment. "The organization can set an execution target-say 80 or 95 per cent. Be that as it may, denying the last 10 percent of any installment is not legitimate,". Basically, there are cases of newcomer architects, employed from IITs, indicating execution of more than 90 for every penny. In any case, in the general normal, their execution figures in the last 10 percent. Subsequently, they are not getting any execution connected pay. Till now, operations at any of the NTPC control stations are not affected. The biggest power maker in the nation works 15 coal-fired and 7 gas-fired stations on independent premise. This records to almost 41,000 mw.
__________________ Answered By StudyChaCha Member |