Go Back   2019-2020 StudyChaCha > >




  #1  
Old January 9th, 2018, 03:22 PM
Unregistered
Guest
 
Posts: n/a
Default Vizag Steel Internship

I want to get the details of Internship at Rashtriya Ispat Nigam Limited - Visakhapatnam Steel Plant so can you provide me?
Reply With Quote Quick reply to this message
Other Discussions related to this topic
Thread
Vizag Steel Ltd Recruitment
Vizag Steel Cut Off
Vizag Steel Location
Vizag Steel Plant MD
Vizag Steel
Vizag Steel SMS
Vizag Steel FAQ
VIZAG Steel Contact No
Price of Vizag Steel
Vizag Steel Pay Revision
Vizag Steel Oct
Vizag Steel Pay Scale
Rates Of Vizag Steel
Vizag Steel ITI Jobs
Steel Suppliers In Vizag
Vizag Steel Vizag Steel
Vizag Steel Authority
How To Do Internship In Vizag Steel Plant
Vizag Steel Email
Vizag Steel MT Through GATE






  #2  
Old January 9th, 2018, 03:24 PM
Rahul Parik
Super Moderator
 
Join Date: Dec 2011
Posts: 14,223
Default Re: Vizag Steel Internship

The Project Trainee Management System (PTMS) of Rashtriya Ispat Nigam Limited - Visakhapatnam Steel Plant aims to ease the whole process of getting the Industrial Training/Internship at the organization.

Right from applying the request for the Industrial Training/Internship, to the end can be completed in online mode through this Project Trainee Management System(PTMS).

All the required forms and formats can also be downloaded and used at the time of joining for the Industrial Training/Internship.

Industrial Training/Internship Requisition Workflow:


Visit the website of Project Trainee Management System (PTMS), Rashtriya Ispat Nigam Limited

Create login in PTMS System using New User Registration option on Login Page.

Verify your email, with verification emial link sent to your Email-id, as provided in the registration.

Upload all Group details in system, along with Training Requisition Letter from institute.

Upload all Individual Trainee details in system and wait for processing by RINL-VSP Training Dept.

On Successful acceptance of the requisition for training, download all formats as provided and report for training on the concerned day.

Successful Registration in RINL-VSP's Project Trainee Management System (PTMS) does not guarantee the acceptance for training, as the same may be rejected due to reasons like incomplete/incorrect filling of form or non-availability of training slots, during peak months.

Contact-

Rashtriya Ispat Nigam Limited
3rd Floor, Meghalaya Tower, Church Road, Jaipur, Rajasthan 302001
__________________
Answered By StudyChaCha Member
Reply With Quote Quick reply to this message
Sponsored Links






















Reply


Reply to this Question / Ask Another Question
Your Username: Click here to log in

Message:
Options

Forum Jump


All times are GMT +6.5. The time now is 08:55 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.42 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.