Go Back   2021-2022 StudyChaCha > StudyChaCha Discussion Forum > General Topics

  #1  
Old December 28th, 2017, 04:00 PM
Unregistered
Guest
 
Default CMD OF THDC

I am doing my engineering final year and making project report on the topic THDC India Limited searching for company details. Will you please provide me name who the CMD of THDC India Limited and also provide address and contact details of this corporation?
Reply With Quote
Other Discussions related to this topic
Thread
Thdc Recruitment For Engineers
E Tender THDC
THDC Telephone Directory
THDC Facility Management
THDC Engg College
THDC
Full Form Of THDC
THDC Koteshwar Near TEHRI
THDC Guest House
THDC Candidate Login
THDC College Website
Latest Vacancies In THDC
Aerosys THDC Seer
Www THDC Gov In
How to Reach THDC
THDC Btech
NHPC THDC
THDC Thermal
THDC Legal
Website Of THDC






  #2  
Old December 28th, 2017, 05:02 PM
Super Moderator
 
Join Date: May 2011
Default Re: CMD OF THDC

THDC India Limited, is a company jointly promoted by Government of India and Government of Uttar Pradesh.

It was incorporated in July’88 to develop, operate and maintain the Tehri Hydro Power Complex and other Hydro Projects.

CMD OF THDC

Dhirendra Veer Singh took over as the chairman and managing director (CMD) of THDC India Ltd (THDCIL)

List of projects:

1 TEHRI DAM & HPP(STAGE-I) Uttarakhand 4 * 250 1000 2006-07
2 KOTESHWAR HYDRO POWER PROJECT Uttarakhand 4 * 100 400 2011-12
3 PATAN WIND POWER PROJECT GUJARAT 25 * 2 50 2016
4 DEVBHUMI DWARKA WIND POWER PROJECT GUJARAT 30 * 2.1 63 2017

Some services offered:

Necessity of a project vis-à-vis Power Scenario and existing installations including
Power Potential and E&M Studies.
• Pumped Storage Schemes.
• Survey and Investigations for Hydro Power Projects
• River Systems, Topographical and Geo-technical aspects for River linking Projects.
• Hydrology and hydraulics including hydrologic Modeling.
• EIA/EMP Studies.
• Rehabilitation Action Plan.
• Social Impact Assessment Studies.
• Construction material and quarry site studies
• Assessment of economic viability of a project viz cost benefit studies.
• Conceptual layouts and planning of components.
• Infrastructural Requirements.
• Contract Documentation and award advice.
• Cost estimates.
• Preparation of Feasibility Reports and Detailed Project Reports

Contact:

THDC INDIA LIMITED
Corporate Office, Rishikesh
Pragatipuram, By Pass Road,
Rishikesh - 249201 (Uttrakhand)
__________________
Answered By StudyChaCha Member
Reply With Quote
Reply


Reply to this Question / Ask Another Question
Your Username: Click here to log in

Message:
Options



All times are GMT +6.5. The time now is 12:26 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2

1 2 3 4 5 6 7 8